No, me to tak jasny neprijde, proc teda jednou bez problemu zamitne, ze GPU na PS3 nebude Cell based a po druhe chodi kolem horke kase?Původně odeslal Puťas
No, me to tak jasny neprijde, proc teda jednou bez problemu zamitne, ze GPU na PS3 nebude Cell based a po druhe chodi kolem horke kase?Původně odeslal Puťas
But of course, the unlimited evilness of the ultimate tool of mischief, the universal explanation for sucky performance from anything other than nVidia, TWIMTBP, strikes again. The shenanigans know no bounds....luckily, in this sea of pain and anguish,the shining beacon of light and righteousness, ATi, stand, with their Get in the Game program that they managed so badly(because they`re not evil like nV, see, so they couldn`t actually have a program where they worked really close with devs, pushing their tech into their stuff) that no game is part of it. - Morgoth the Dark Enemy
Myslim, zeby sme si mali trochu pockat, pretoze momentalne je signal to noise/bs ratio mimoriadne nizky. Tak ci onak, na desktopoch to zacne byt zaujimave (a to hovorim ako o NV tak ATI) az v roku 2006 - teda ak sa Longhorn neopozdi.
R520 nie je rovnaka liga. To by sme sa museli bavit o R600 (aka desktopovy Xenon). Kazdopadne, co je "CELL na grafiku"?Původně odeslal MATRIX
Intel Core 2 Duo E6600 @ 3.2GHz (8 * 400MHz) @ 1.3V with Zalman CNPS9500 AT @ 1800RPM, ASUS P5B Deluxe/WiFi, 2x1GB Corsair Twin2X PC2-6400 DDRAM @ 400MHz (4-4-4-12) @ 2.1V, Leadtek 8800GT 512MB, WD Caviar SE16 250GB, Asus DRW-1608P3S, Creative SB Audigy Value, Logitech X-230 speakers, Enermax Liberty 400W, 2x120mm Thermaltake case fan @ 1800RPM, Thermaltake Aguila black case, HP LP2065 LCD, Logitech MX400
proč by to měli zamítat desetkrát?Původně odeslal Masster
Ze bychom se nakonec NV48 preci jen dockali?
http://www.digitimes.com/news/a20041220A7039.htmlNvidia has not given up on the NV48 and is expected to roll out the GPU in the second quarter of next year, despite market rumors saying the company has cancelled the chip, according to sources at Taiwan graphics card makers.
However, Nvidia plans to have Taiwan Semiconductor Manufacturing Company (TSMC) produce the NV48, instead of IBM, as originally planned, the sources noted. The NV48 will be built using a 0.11-micron process, the sources added.
Improved yields of the GeForce 6600 and GeForce 6200 manufactured at TSMC would probably be the reason for Nvidia to shift the production of the NV48 back to TSMC, the sources said.
The NV48 will take on ATI’s next-generation high-end graphics chip, the R520, which is also expected to be launched in the second quarter of 2005. The R520, however, will be the industry’s first GPU produced using a 90-nm process at TSMC.
But of course, the unlimited evilness of the ultimate tool of mischief, the universal explanation for sucky performance from anything other than nVidia, TWIMTBP, strikes again. The shenanigans know no bounds....luckily, in this sea of pain and anguish,the shining beacon of light and righteousness, ATi, stand, with their Get in the Game program that they managed so badly(because they`re not evil like nV, see, so they couldn`t actually have a program where they worked really close with devs, pushing their tech into their stuff) that no game is part of it. - Morgoth the Dark Enemy
Toto téma si právě prohlíží 1 uživatelů. (0 registrovaných a 1 anonymních)